During the winter even before we were mired in the mud, our heavy equipment hopelessly stuck on the 4 neighboring shoreline projects of Ard, Sanchez, Kojak & Dworcyaczyk projects – the Lockhart’s Boathouse project slowly wound through nearly 6 months of US Army Corps of Engineers permitting.
As soon as it was approved we stuck a crew over there, working during the heavy rains of late January and early February, to cover the addition of this old boathouse in Trinity County. Since we cannot move our equipment nor work it, our workers were forced to build all the future boathouse projects we had piling up – instead of the bulkheads that we have back-scheduled spread throughout East Texas from Crockett to Galveston.
This construction project went quickly even in the constant rain – and a two boat slips and a nice covered family recreation area was added to the 20+ years old existing boathouse.
Ray’s Marine moved from the Sanchez project to this one, and then back to Ard before finally getting back to work on their own monsterous 3,000+ sq. ft. boathouse in Coldspring.
Thank You Ray, Adam and Ron for leaving yours for ours and pulling our asses out of a scheduling nightmare in the rainiest winter since 2006~!!!
Within 13 days it was done.